![2" Galvanized Steel End Band [14 Gauge] For Chain Link Fences](https://img.chainlinkstore.shop/images/product/2-galvanized-steel-end-band-1.png)
Original: $0.52
-65%$0.52
$0.18The Story
Steel end bandsāalso known as brace bandsāareĀ a key fitting for the installation of chain link panels. Use these bands on your terminal posts for attaching bottom tension wire, horizontal rails, and barbed wire. (Terminal posts include gate posts and end posts.)Ā Prior to installing the end bands, verify that the posts of your chain link fence panels have been fitted with tension bands. Then, install the end band by slippingĀ its brace over the terminal post adjacent to the rail end you want to attach. Now slide the tip of the end rail between the end band's tangs. TheĀ final step is toĀ secure the band and rail together usingĀ a carriage bolt (sold separately).
This 2" Galvanized Steel End Band is rust resistant, as it has been fashioned from galvanized steel.
- Fits 2ā diameter tubingĀ
- Steel constructionĀ
- Also great for gate framesĀ
- GalvanizedĀ
- Does not include Carriage nuts and boltsĀ
- Comes in black, part #10455B
Details
How the part fits?Ā A 2ā end bands are designed to go over 2ā terminal posts.
Where is it installed? A 2ā end band is installed to support the rail end at the top of the fence. The 2ā end band will be placed adjacent to the rail end on the 2ā terminal post.
How many do you need? Ā You will need (1) 2ā end band per termination of fence. For every full stretch of fabric, you will need (2) end bands for your (2) terminal posts.
Specifications
2" post size, .18lbs
Instructions
2ā end bands should be installed after you install your tensions bands. Your end band will slide over your 2ā terminal post adjacent to your rail end. You will then slide your rail end in between the tangs of the end band and place a 5/16ā x 1-1/4ā carriage bolt through the band and rail end and tighten the nut.
Description
Steel end bandsāalso known as brace bandsāareĀ a key fitting for the installation of chain link panels. Use these bands on your terminal posts for attaching bottom tension wire, horizontal rails, and barbed wire. (Terminal posts include gate posts and end posts.)Ā Prior to installing the end bands, verify that the posts of your chain link fence panels have been fitted with tension bands. Then, install the end band by slippingĀ its brace over the terminal post adjacent to the rail end you want to attach. Now slide the tip of the end rail between the end band's tangs. TheĀ final step is toĀ secure the band and rail together usingĀ a carriage bolt (sold separately).
This 2" Galvanized Steel End Band is rust resistant, as it has been fashioned from galvanized steel.
- Fits 2ā diameter tubingĀ
- Steel constructionĀ
- Also great for gate framesĀ
- GalvanizedĀ
- Does not include Carriage nuts and boltsĀ
- Comes in black, part #10455B
Details
How the part fits?Ā A 2ā end bands are designed to go over 2ā terminal posts.
Where is it installed? A 2ā end band is installed to support the rail end at the top of the fence. The 2ā end band will be placed adjacent to the rail end on the 2ā terminal post.
How many do you need? Ā You will need (1) 2ā end band per termination of fence. For every full stretch of fabric, you will need (2) end bands for your (2) terminal posts.
Specifications
2" post size, .18lbs
Instructions
2ā end bands should be installed after you install your tensions bands. Your end band will slide over your 2ā terminal post adjacent to your rail end. You will then slide your rail end in between the tangs of the end band and place a 5/16ā x 1-1/4ā carriage bolt through the band and rail end and tighten the nut.















